How long does a bathroom remodel take?expand_more
A refit in the existing footprint commonly runs two to four weeks on site once materials have arrived, dictated by tile setting, waterproofing cure times and inspection slots. A full rebuild with relocated fixtures runs longer, and any permit needing plan review sits ahead of all of it. Ask for a programme with the inspection points marked.
Can I keep the original clawfoot tub and hex tile?expand_more
Frequently yes, and it is often the most characterful part of the finished room. Cast-iron tubs can be reglazed in place and period floor tile can be patched by people who specialise in it. Say early that you want it kept, because a crew that has priced a skip and a fast strip-out will work differently from one preserving what is there.
Do I need to replace all the plumbing in the house?expand_more
Not necessarily, but understand what you are connecting to. If the corroded galvanised run feeding the bathroom stays in place, the new fittings inherit the old flow. Many people take the opportunity to replace back to the main while ceilings are already open, because the labour is largely the same visit.
What causes the black marks on the ceiling and wall?expand_more
Almost always surface condensation rather than a leak, on cold uninsulated surfaces in a room producing a lot of moisture with nowhere to put it. The remedy is a properly sized fan ducted outside, controlled by humidity or a timer, together with insulation on the cold wall. Wiping it off and repainting simply resets the clock.
How do I compare bids that come in miles apart?expand_more
Read what is excluded. The usual gaps are the waterproofing system, the extract fan and its ducting, subfloor repair, replacing supply lines beyond the room, and who supplies the sanitaryware. Fix the fittings allowance yourself and hand every bidder the same figure, and the remaining difference is genuinely about the builders.
What if they find rot or asbestos when they open it up?expand_more
Both are common in houses of this age, and neither should derail a well-run job. Agree the change-order process at signing: stop, photograph, price, obtain your written approval, resume. Materials in a pre-1980 bathroom may need testing before demolition, and licensed handling if positive, so allow for the survey in the early programme.
Is there a charge for using this?expand_more
No, none. Describing the bathroom and getting quotes back costs nothing, and hiring one of the contractors does not trigger a fee either. The only money involved is what you agree with your contractor for the work itself.
How many contractors will make contact?expand_more
Usually between two and four, selected for bathroom work of your size in your part of Seattle rather than pulled from a general list. Your details reach only those matched to the job. Nothing is resold and nobody else sees your enquiry.