- Measured area and surface type
- Existing coating identification and adhesion
- Lead-safe determination
- Repairs before coating
- Preparation standard
- Access and staging
- Interior protection and air control
- Exterior weather and moisture
- Primer and finish system
- Samples, colors, and transitions
- Cleanup and acceptance
- Closeout and future maintenance
Painting proposals become comparable when they describe the same substrate and accepted finish. Measure areas, identify coating and damage, define preparation and repairs, confirm lead-safe responsibilities for covered older housing, select compatible products, and set samples and inspection standards. Seattle permit or access rules may also matter when related repairs, scaffolding, or street use extend beyond coating work.
1. Measured area and surface type
List walls, ceilings, trim, doors, cabinets, siding, masonry, metal, decks, and other surfaces separately. Record dimensions, exclusions, sides, profiles, and access. Gross floor area does not describe paintable area or detail. Require bidders to use the same measured boundary so differences reflect scope rather than arithmetic assumptions.
2. Existing coating identification and adhesion
Record peeling, chalking, alligatoring, staining, rust, efflorescence, previous patching, and unknown coatings. Use appropriate tests or representative preparation to establish compatibility and adhesion. Applying another coat over a failing or contaminated layer can hide the symptom briefly without creating a durable bond.
3. Lead-safe determination
EPA's Renovation, Repair and Painting program applies to qualifying work that disturbs paint in pre-1978 housing and child-occupied facilities. Establish building age, painted-surface disturbance, certified-business responsibility, containment, cleaning, documentation, and occupant protection before preparation begins. Do not treat lead-safe work as a vague optional allowance.
4. Repairs before coating
Map failed sealant, decay, water damage, cracked plaster, damaged drywall, open joints, rust, loose siding, and failed fasteners. Correct water or structural causes and define repair materials and boundaries. Separate minor surface filling from carpentry, plaster, masonry, or regulated work so the coating estimate does not conceal an unresolved assembly failure.
5. Preparation standard
Write cleaning, degreasing, scraping, sanding, dust control, rust treatment, caulk removal and replacement, patching, feathering, priming, masking, and surface-readiness criteria by substrate. Preparation is labor and often the main difference between proposals. The word prep alone cannot establish whether loose material or glossy surfaces are actually addressed.
6. Access and staging
Price ceiling height, stairwells, roof edges, narrow setbacks, landscaping, lifts, scaffolds, street or alley constraints, overhead utilities, material movement, and daily securing. Include setup and relocation. Two homes with the same painted area can require very different access systems, protection time, and production sequence.
7. Interior protection and air control
Define furniture and art movement, floor and fixture protection, dust barriers, ventilation, odor expectations, occupied-room sequencing, pet and child controls, daily cleanup, and return-to-use criteria. EPA remodeling guidance addresses dust, pollutants, ventilation, and moisture. Product choice does not eliminate the need for a work-zone plan.
8. Exterior weather and moisture
Record substrate moisture, shade, dew, precipitation, temperature, wind, sun exposure, and product installation limits. Define who decides whether conditions are acceptable and how interrupted work is protected. A broad summer or dry-weather promise cannot replace current surface readings and manufacturer requirements for application and cure.
9. Primer and finish system
List manufacturer, product, sheen, color, primer, number and purpose of coats, application method, spread assumptions, compatibility, and special performance needs. State whether coverage or a fixed coat count controls acceptance and how dramatic color changes are handled. Proposed substitutions should preserve the accepted system and warranty conditions.
10. Samples, colors, and transitions
Approve colors and sheen on representative surfaces under site lighting. Define cut lines, accent boundaries, cabinet interiors, closets, exposed edges, hardware removal, and transitions to retained coatings. Record reasonable match limitations. A color name alone does not prove appearance across different substrates, gloss levels, or weathered elevations.
11. Cleanup and acceptance
Inspect from agreed normal viewing conditions after appropriate dry time. Review coverage, holidays, runs, lap marks, edges, repaired areas, sealant, overspray, hardware operation, labels, and restored surfaces. Define touch-up handling and dispose of debris and materials appropriately. Resolve a numbered punch list before final acceptance.
12. Closeout and future maintenance
Retain product names, colors, sheens, batch information when useful, samples, lead-safe documentation when applicable, approved repairs, photographs, care guidance, cure limits, warranties, and leftover-material storage. Identify expected maintenance at joints, exterior exposures, and high-wear areas so later work begins from known materials rather than guesswork.
Frequently asked questions
Is there one standard Seattle painting price?
No. Property condition, measured quantity, selected systems, permits, access, protection, and complete restoration differ by project.
How should estimates be compared?
Normalize the same observations, quantities, products, allowances, exclusions, permits, testing, and accepted finish.
How should hidden work be authorized?
Use photographs, measured findings, and written scope, price, permit, and schedule approval.
Do permits affect the budget?
Yes when review, drawings, corrections, inspections, or utility coordination are required by the actual scope.
How do I verify the contractor?
Match the legal and specialty businesses to Washington L&I records.
What belongs in closeout?
Keep approvals, permits, inspections, tests, product data, photographs, warranties, and punch-list acceptance.
Sources and local guidance
- Renovation, Repair and Painting ProgramUnited States Environmental Protection Agency
- Best Practices for Indoor Air Quality When RemodelingUnited States Environmental Protection Agency
- PermitsSeattle Department of Construction and Inspections
- Verify a Contractor, Tradesperson or BusinessWashington State Department of Labor & Industries