Plan a kitchen remodel in Seattle, WA around the house you actually have

The typical Seattle kitchen being remodelled today was designed as a small service room at the back of a Craftsman or box house, walled off from the dining room, lit by one window and served by wiring that predates the refrigerator. Nearly every decision in the project follows from that, and from how much of the original fabric you decide to disturb.

Find Your Contractors Today
  • 100% free for homeowners
  • No obligation, ever
  • Licensed & insured pros

What makes a Seattle kitchen remodel more involved than it looks?

The age of the house. Behind the plaster of a 1910s or 1920s kitchen you commonly find surviving knob-and-tube, a service too small for modern appliances, galvanised supply pipe and joists that have settled out of level. Opening the wall to the dining room usually adds structural work and plan review on top.

The wall between the kitchen and the dining room

Almost every enquiry starts here, because the original plan gives you a closed galley beside a formal dining room and everybody now wants one space. Sometimes that wall is a partition and the job is a day's work. Often it carries ceiling joists or a bearing point from the storey above, in which case you need a beam sized by an engineer, posts with a load path down to something solid in the basement, and a permit. Have that answered before cabinets are ordered, because it moves both the budget and the programme.

Electrical is usually the hidden half of the budget

A kitchen from the 1920s was wired for a light and perhaps a socket. A modern one wants dedicated circuits for the cooker, oven, refrigerator, dishwasher, disposal and microwave, plus protected small-appliance circuits and enough capacity at the panel to carry them. In houses that still have knob-and-tube feeding the back of the property, that discovery is normal rather than alarming, but it is real money and it needs its own permit and inspection. Ask every bidder what they have assumed about the service.

Nothing in an old house is level, and cabinets do not forgive that

A hundred years of settlement on a post-and-beam basement structure leaves floors that fall away from the centre of the house and walls that are out of plumb by more than a fitter can scribe away. Good kitchen crews survey this before they order anything, then plan for levelling the subfloor, packing the runs and building the worktop template on site rather than off the drawing. It is unglamorous work that decides whether the finished room looks made-to-measure or approximate.

Ventilation you can actually route

A serious extractor needs a duct to outside, and in a Seattle bungalow the run frequently has to cross joists, dodge a masonry chimney and exit through cedar siding or a soffit. Recirculating hoods get specified because the ducting was never worked out, and then the room smells of last night's cooking for the next decade. Settle the route at design stage. In a damp climate with tight modern insulation, moving cooking moisture out of the house matters more here than the appliance brochure suggests.

Sequence the order dates against the permit

Cabinetry, stone and appliances all have lead times, and permits that need review have their own. The failure everyone regrets is paying for cabinets that then sit in a garage for two months, or worse, demolishing a working kitchen and discovering the permit is still in corrections. A contractor worth hiring will hold demolition until the permit is issued and time the cabinet order so delivery lands after the rough-in inspection has passed.

Completely free. No obligation.

Describe the project once and we match it with vetted local pros who actually do this work — you choose who to hire, or nobody at all.

Find Your Contractors Today
Good to know locally

Check registration before the deposit, not after

Kitchen work attracts a lot of one-man operations, some excellent and some unregistered. Washington requires registration with Labour and Industries along with a bond and liability insurance, and the state's free lookup shows status, expiry dates and any claims made against the bond. Match the legal business name to the name on the contract and on the cheque you are about to write.

Which permit route your kitchen takes

A refit that keeps everything where it is may need nothing more than trade permits. Move plumbing and the plumbing permit follows; add or alter framing and you are into a construction permit with plan review at SDCI, measured in weeks and sensitive to how complete the submittal is. The route, not the square footage, sets the calendar.

Pre-1980 houses and what is in the old finishes

Sheet vinyl, floor adhesive, textured coatings and pipe lagging in a house of this age can contain asbestos, and older paint layers can contain lead. Washington rules require survey and licensed handling before certain demolition, and reputable contractors build testing into the early programme rather than treating it as a surprise. Budget for the survey; it is small money against the cost of stopping work mid-demolition.

Three levels of kitchen work, and what each one drags in with it

Level of workWhat actually movesKnock-on effects
Refit in placeCabinets, worktops, appliances, finishesTrade permits at most; shortest disruption
Refit plus electrical modernisationNew circuits, possibly a larger serviceElectrical permit and inspection; plaster repair
Relocating sink, hob or wasteDrainage, venting, supply runsPlumbing permit; floor and ceiling opened below
Opening up to the dining roomA wall that is often carrying loadBeam design, engineer's stamp, SDCI review
Kitchen plus a rear extension or deck doorEnvelope, footing, sometimes gradeFull review, weeks rather than days
What a kitchen remodel costs in Seattle

Seattle prices at the upper end for this work, and the spread is enormous because the label covers everything from a cosmetic refit to a structural reconfiguration. As a way of thinking about it rather than a quotation: a straight replacement keeping the layout, using stock or semi-custom cabinetry, tends to land in the tens of thousands; a full remodel with new services, bespoke cabinetry and stone runs to a multiple of that; and taking out a bearing wall or extending the room adds engineering, permit and structural cost on top of the kitchen itself. Ask for the bid to be broken into demolition, structure, mechanical and electrical, cabinetry, surfaces and finishes, so you can see which part is driving the number. Confirm whether retail sales tax on labour is inside or outside the figure, and expect an allowance for concealed conditions on any house from this era — a bid without one is not cheaper, it is just less finished.

Areas we serve
FremontWallingfordBallardMagnoliaColumbia CityRainier Valley…and more
Frequently asked questions
How long will my kitchen be out of use?

For a refit in place, commonly a few weeks once materials are on site. For a job with new services and structural work, plan on considerably longer and add the permit period before anything starts. Ask for a programme showing demolition, rough-in, inspection, drywall, cabinets and worktop template, because the template alone adds a wait after the cabinets are set.

Can I keep the original cabinets or the fir floor?

Often, and it is frequently the best value in the whole project. Period cabinetry can be repaired and repainted, and old-growth fir flooring under later vinyl usually sands back beautifully. A contractor who is fluent in these houses will tell you what is worth saving. One who wants everything skipped may simply find replacement quicker to price.

Do I need an architect or a kitchen designer?

For a like-for-like refit, the cabinet supplier's designer is generally enough. Once walls move, an architect or a designer working with a structural engineer earns their fee, both in the layout and in producing a drawing set that survives plan review without repeated corrections.

Will removing that wall need an engineer?

If it is carrying load, yes, and in a house with a storey above it very often is. The engineer sizes the beam and specifies the posts and the path down to the foundation. That drawing is part of the permit submittal, so getting the assessment done early is what keeps the whole programme from slipping.

What is a sensible deposit and payment schedule?

Enough at the start to cover mobilisation and the deposits on long-lead items, then payments tied to completed and inspected stages rather than dates on a calendar, with a meaningful sum held back until the snagging list is genuinely finished. Be wary of a large up-front payment that has no materials order behind it.

Should I stay in the house during the work?

Most people do, and it is manageable if you set up a temporary kitchen somewhere with a socket and a sink. What makes it bearable is dust containment, a plan for where the skip goes given how little kerb space most of these streets have, and agreed working hours. Ask about all three before signing.

What will this service cost me?

Not a penny. Setting out your project and receiving quotes is free, and if you hire one of the contractors there is still no fee to us. You pay the contractor for the kitchen; that is the whole of it.

How many people will get in touch?

Typically two to four kitchen contractors, picked because they do this kind of work at this kind of scale in your area. Only those matched to your job ever see your name and number. We do not resell requests and your details go no further.

More services in your area

Tell us about the kitchen

Describe the room, the age of the house and whether you want walls moved. We will match you with L&I-registered Seattle kitchen contractors. Free to you, with no obligation to hire anyone.

Find Your Contractors Today

100% free · No obligation · Takes about 2 minutes — only matched pros ever see your number